Good placement protects airflow, defrost drainage and acoustic comfort. Site design matters as much as the equipment.

Key decisionDecision: validate the location on site before the final quote.

Breathing room in winter

The unit must remain clear of snow and maintain the manufacturer’s required airflow. Its base and elevation should suit local conditions.

Managing defrost water

Defrost creates water that can refreeze. Plan drainage away from walkways, foundations and areas where ice could create a hazard.

Reducing disturbance

Consider bedrooms, windows, neighbours and sound-reflective surfaces. Ask for the published sound rating and planned vibration controls.

Official sources

Updated :

Programs and criteria can change. Always verify the official source before making a decision.